Upgrade of the East Block distribution boards
The Royal Courts of Justice, commonly called the Law Courts, is a court building in London which houses the High Court and Court of Appeal of England and Wales. It is one of the largest courts in Europe and is a Grade 1 listed building.
Scope of works
Due to the age of the existing distribution boards, our client had identified that these were now obsolete and spare parts no longer available. This was rightly deemed as a high risk to the the business should any of the parts became faulty.
Solution
Based on the tender documents provided, the solution was to replace the distribution boards with the latest Schneider Isobar P boards.
The works
Based on the tender documents provided, the solution was to replace the distribution boards with the latest Schneider Isobar P boards.
Related case studies
Service provided: Electrical Vehicle (EV) Charger Installation
As part of a nationwide sustainability project to install electric vehicle (EV) chargers to courts, TECS installed a number of charging points..........
Arla Dairies - Aston Clinton
Service provided: Lighting control
With our team of specialist lighting control engineers, TECS have been maintaining the state of the art lighting system throughout the site..........
The Guildhall, City of London
Service provided: Fixed wire testing (EICR)
As part of the ongoing maintenance regime, TECS were tasked with carrying out the 5 years fixed wire testing of this vast site..........
Commercial
Industrial
Education
Hazardous Area
Healthcare
Leisure